Brief description of the construction work: the construction of a dairy processing plant with ground floor and first floor design, technical content according to the design documentation with a valid building permit. Total useful floor area: 1276.16 m2.
In parallel with the construction of the milk processing plant the complete modernization of the disused dairy farm is taking place.
Brief description of the construction work: Complete modernization of the existing unused dairy farm, reconstruction and renovation of the existing buildings, and construction of new buildings and structures with the technical content according to the design documentation with a valid building permit.